Contact Us

Have any questions? We’d love to hear from you!

Gibson Energy

1700, 440 – 2 Ave S.W.
Calgary, AB T2P 5E9
Telephone: 1-403-206-4000
Facsimile: 1-403-206-4001

Emergency Contact Phone Number: 1-866-553-0111

Gibson Energy is located in Millennium Tower, in the heart of the Eau Claire district. The building is LEED GOLD and BOMA Best Platinum certified.

Gibson Corporate

Gibson Energy uses an online resume application system to collect candidate information for jobs. It is strongly recommended that you apply online to be considered for current and future positions.

Media line: 1-403-476-6334

[email protected]

Business Inquiries

Edmonton, AB
10534 17 Street NW, Edmonton, Alberta T6P 1P4

Edson, AB
351-26 Street, Edson, Alberta T7E 1N9

Hardisty, AB
Box 253, Hardisty, Alberta, T0B 1V0

Houston, TX
Suite 3300, 1201 Louisiana Street, Houston, Texas,  77002

Moose Jaw, SK
641 Manitoba Street East, Moose Jaw, Saskatchewan S6H 6E3

Rimbey, AB
Box 24, Rimbey, Alberta T0C 2J0

Sexsmith, AB
9201-95 Avenue, Sexsmith, Alberta T0H 3C0

[email protected]

Land Inquiries and Crossing Agreements

At Gibson Energy, we are committed to employing responsible management practices which will result in protecting the environment, health and safety of our employees, contractors and the public. We have a comprehensive Emergency Management Program with active initiatives in place to educate and inform our neighbours and ensure the safety of those working and living in areas surrounding our pipelines.

If you are planning to dig or disturb the ground near a pipeline Right-of-Way, it is your responsibility to ensure that your activities don’t disturb the pipeline. Prior to starting any type of ground disturbance work, you are required to Call or Click Before You Dig. For further information on ground disturbance activities, visit our Pipeline Safety page.

We believe it is our duty to ensure anyone excavating near our pipelines and facilities knows the precautions to take before beginning their work. If you are working near, or crossing, Gibson Energy pipeline or facility, a crossing agreement is required. To obtain a crossing agreement, you will need to provide Gibson land management team with the following information:

  • Company legal name for whom the work is being done
  • Legal land location of the proposed work
  • Project name
  • Project scope of work description
  • Project timelines
  • Affected Gibson Energy facilities: (e.g. pipeline license and line number, survey plan number, PLA number, etc.)
  • Measurements and distances in relation to the Gibson Energy facilities
  • Survey plan and identified crossing location
  • Access roads use requirements
  • Temporary Work Space requirements and measurements
  • Used vehicle and equipment weights and information

Gibson Energy representative must be notified 72 hours in advance of the start of construction and be present at the site during ground disturbance activities within 5 meters of Gibson’s pipeline(s) to ensure adequate protection is maintained during construction activities.

We have provided the following form to assist you in requesting a crossing agreement. Requests and additional inquiries can be sent to our Land Administrator by email.

Includes DOT Reportable and Preventable crash history only. Income verification is not provided. Click here to start the search.

If you’re interested in working with us, please visit our contractor page.

Visit Other About Us Pages